Entertainment and Sports Arena


The Project

Washington D.C.’s Entertainment and Sports Arena (ESA) opened in September 2018 and serves as the practice facility for the NBA’s Washington Wizards and the home arena for both the WNBA’s Washington Mystics and the NBA G League’s Capital City Go-Go. It also hosts other events like concerts and boxing.
 
The 120,000-square-foot arena, located in the historic St. Elizabeths East neighborhood, seats 4,200 people. The cost of the project totaled $65 million, and the arena is expected to attract close to 400,000 fans annually.
 

Location:
Washington D.C.
Products:
Optimo
The materiality of the historic buildings will be used for the building’s common spaces to create a unified thread to its environment on the greater St. Elizabeths Campus.
 
-Events DC, designer and builder of the arena
 
Entertainment_and_Sports_Arena_Washington_DC_10_OP_US

Cutting Costs

Initially, the plan called for terracotta panels so the facility would blend in with the brick buildings in the neighborhood. But after seeing the high cost of using terracotta, the architects changed the design to utilize insulated metal panels. This change from terracotta to insulated metal panels saved an estimated $100,000 - $200,000.
 
In order to still blend in the new arena with the brick buildings, the Kingspan team put in a tremendous amount of time to find perfect colors to use on the facade. The final colors used were Colonial Red, Redwood, Sandstone and Bone White (all Kingspan standard colors) and Audubon Russet, a custom color from Valspar. This color combination makes the brand new arena blend into the surrounding buildings, some of which date back to the 1930’s.
 
 
Download
Entertainment_and_Sports_Arena_Washington_DC_03_OP_US
Previous
Next

Building without exposed fasteners

The specifications for the ESA project called for an envelope that did not show any visible fasteners. Building without exposed fasteners was no small task, as the arena has more than 53,000 square feet of metal panels. Kingspan met the challenge by engineering a concealed fastener solution that delivers a smooth, flat appearance without the need for exposed trim at the base, corners or openings.

Products used on this project

Entertainment_and_Sports_Arena_Washington_DC_Case_Study_Cover_OP_US

Download this case study

Case study PDF of Entertainment and Sports Arena in Washington D.C., USA

Contact Us

Let us transform your building with Optimo and our other design-ready products.

Contact your local Sales Rep today

We use cookies on our website www.kingspan.com. To find out more about the cookies we use, or to change your cookie preferences i.e. to remove your consent to our use of certain categories of cookies, please visit our Cookie Policy & Control page.

Please click “Accept and close” to accept the use of cookies on our website. If you do not click “Accept and close” but continue to use this website: you thereby consent to the use of all Kingspan's cookies and third party cookies for the purposes of improving performance, improving functionality and audience measurement, in accordance with the terms laid out in our Cookie Policy & Control page; and we will assume that you have read and understood our Cookie Policy & Control page.

The Cookie Policy & Control and Website Privacy Notice were updated on 13 August 2018.