Challenge
The project team for the Kal-Tire Place required keen coordination due to multiple trades on the facility’s expansion. An NHL-size ice surface with seating, lobby, administrative areas, and amenities with concessions and elevators were required to be constructed by the grand opening in Fall of 2018. The team worked closely with the city’s representatives and various consultants along with the talents from the design firm MQN Architects with the intention of focusing on speed-of-build and easy installation.