Influence
The architect of record achieved the LEED Platinum level status in 11 months, and the lead time for delivery of the Kingspan Insulated metal panels was also unmatched.
“We looked at other manufacturers and the Kingspan QuadCore® is what made the difference for us,” stated Marty Merkel, AIA, LEED AP with JRA Architects.