Energy from Waste Facility

One of Europe's most efficient energy from waste facilities.

The Project

The new South West Devon Waste Partnership facility, constructed my main contractor Kier with Massey Cladding Solutions Ltd, is one of the most efficient energy from waste sites in Europe, designed to process 250,000 tonnes of waste annually to produce 22.5MW of electricity and 23.3MW of heat each year.

The building, which has been designed to provide a modern and attractive structure for the Plymouth area, features 1450m² of Trapezoidal Roof panels, along with 22,000m² of insulated wall panels from the AWP range in Louvre and Micro-Rib profiles, all finished aesthetically with our flashings and top hats.

Location:
Plymouth, UK
Year:
2016
Wall:
Architectural Wall Panel | Micro-Rib | Top Hats | Flashing | Louvre