2016_ENERGY FROM WASTE_PLYMOUTH_02_AWP MR_UK.jpg

Energy from Waste Facility

One of Europe's most efficient energy from waste facilities.

The Project

The new South West Devon Waste Partnership facility, constructed my main contractor Kier with Massey Cladding Solutions Ltd, is one of the most efficient energy from waste sites in Europe, designed to process 250,000 tonnes of waste annually to produce 22.5MW of electricity and 23.3MW of heat each year.

The building, which has been designed to provide a modern and attractive structure for the Plymouth area, features 1450m² of Trapezoidal Roof panels, along with 22,000m² of insulated wall panels from the AWP range in Louvre and Micro-Rib profiles, all finished aesthetically with our flashings and top hats.

Location:
Plymouth, UK
Year:
2016
Wall:
Architectural Wall Panel | Micro-Rib | Top Hats | Flashing | Louvre
Download
2016_ENERGY FROM WASTE_PLYMOUTH_02_AWP MR_UK.jpg
Previous
Next

We use cookies on our website www.kingspan.com. To find out more about the cookies we use, or to change your cookie preferences i.e. to remove your consent to our use of certain categories of cookies, please visit our Cookie Policy & Control page.

Please click "Accept and close" to accept the use of cookies on our website. If you do not click "Accept and close" but continue to use this website: you thereby consent to the use of all Kingspan's cookies and third party cookies for the purposes of improving performance, improving functionality and audience measurement, in accordance with the terms laid out in our Cookie Policy & Control page; and we will assume that you have read and understood our Cookie Policy & Control page.

The Cookie Policy & Control and Website Privacy Notice were updated on 13 August 2018.