Case Studies

2019_Kingspan_Architectural Wall Panel _TrapezoidalRoof_Komatsu_UAE_11 115757

Komatsu HQ Dubai

A standout project at the heart of Jebel Ali Freezone - Dubai, UAE - Komatsu HQ Project utilized Kingspan AWP and RW Panels. Read More...

2016_Kingspan_Optimo_Eastgate_Mall_SA_1

East Gate Mall, South Africa

The excellent thermal, acoustic and durability properties of Optimo, key factors in the decision-making process, will ensure East Gate Mall will perform as well as it looks for years to come.

2017_IMPERIAL HEALTH SCIENCES_01_CTF_NAYROBI_TR

Imperial Health Sciences Kenya Ltd

The warehouse is designed to incorporate over 5000 square meters of warehouse floor space, a cold room, receiving and dispatch docks, logistical spaces. Read more..

DSC_2300_

Baku Shipyard

KS103 Micro Lambri and KS100PRW prestige where used on this Azerbaijan project at Baku Ship yard in the Caspian sea during 2015. Read more..

2014_Izdemirenergy_01_SSF_TR

Izdemir Enerji

Trapezoidal Wall, Superlambri and Micro Lambri where used to create this energy plant in Izmir, Turkey in 2014. Read more..

2013_MetroGross market_02_ERW_SSF_TR

Metro
Gross Market

KS103 Kingspan Mega Lambri insulated wall panel system was used to build the project in Izmir alongside Europanel on the roof. Read more..

2014_ALDI GLDTHORPE_49_TD_UK.jpg

Aldi Distribution Centre

A combination of high-performing insulated panels and roof mounted PV feature on Aldi's new super-efficient distribution facility. Read more..

2016_ENERGY FROM WASTE_PLYMOUTH_02_AWP MR_UK.jpg

Energy from Waste Facility

This modern and attractive structure in the Plymouth area, features 1450m² of Trapezoidal Roof panels, along with 22,000m² of insulated wall panels. Read more..

2014_JAGUAR LAND ROVER_STAFFORDSHIRE_07_KE_UK.jpg

Jaguar Land Rover Engine Manufacturing Centre

Jaguar Land Rover had a strong desire to integrate the most cost-effective and efficient solar PV system into the envelope of the new factory building. Read more..

2011_ENERGY COAST CONSTRUCTION SKILLSCENTRE_WORKINGTON_22_AWPFL_UK.jpg

BEC Construction Skills Centre

This contemporary construction skills centre facility was produced using KS1000LP roof panels and KS1000FL, KS1000MR and KS1000RW wall panels. learn more..

2016_INFINITY PARK DERBY_01_TD FR_UK.jpg

Infinity Park

KS1000TD Topdek Membrane, Kingspans single component factory engineered system was used on this project in Derby. Read more..

2016_SWALOW PARK_01_AWP DLTR_UK.jpg

Swallow Park

This industrial warehouse was built using Kingspan Architectural Wall Panels, KS1000RW, KS1000CW to achieve curves in the right places and KS1000MR. Read more..

2016_THORNWICK BAY HOLIDAY_21_TW RW_UK.jpg

Thornwick Bay Holiday Park

This holiday park in Bridlington, Yorkshire was constructed using KS1000RW, KS1000LP and KS1000FL on the buildings. learn more..

2016_THE HUT GROUP LOGISTICS CENTRE_WARRINGTON_06_AWP MR TW_UK.jpg

The Hut Group Logistics Centre

This logistics centre was built in Warrington in 2016 using KS1000TD roof panels , KS1000MR and KS1000RW wall panels. Read more..

2016_COSTCO EUROPEAN DISTRIBUTION CENTRE_CRICK_08_KIP_UK.jpg

Costco European Distribution Centre

The roof of this 2016 Costco warehouse was built using Topdek, the walls contain Ultra Temp and flashings along with Kingspan Daylites. Learn more...

2016_GAZELEY RDC FOR WAITROSE_MILTON KEYNES_16_TR RW_UK.jpg

Gazeley RDC Waitrose

Over 100,000m² of Kingspan insulated panels have been used to deliver a record-breaking distribution centre for Waitrose in Milton Keynes. Read more..

1 2 3

We use cookies on our website www.kingspan.com. To find out more about the cookies we use, or to change your cookie preferences i.e. to remove your consent to our use of certain categories of cookies, please visit our Cookie Policy & Control page.

Please click "Accept and close" to accept the use of cookies on our website. If you do not click "Accept and close" but continue to use this website: you thereby consent to the use of all Kingspan's cookies and third party cookies for the purposes of improving performance, improving functionality and audience measurement, in accordance with the terms laid out in our Cookie Policy & Control page; and we will assume that you have read and understood our Cookie Policy & Control page.

The Cookie Policy & Control and Website Privacy Notice were updated on 13 August 2018.