Kingspan PalDuct system is installed into The Heart of Europe, Dubai.
Kingspan PalDuct Phenolic system is installed into Water’s Edge, Yas Island Abu Dhabi.
Kingspan PalDuct Phenolic system is installed into AKOYA, Dubai.
Kingspan PalDuct Phenolic system is installed into DT1 Residential Tower, Downtown Dubai.
20,000 m2 of the Kingspan PalDuct PIR was installed into the 500 townhouses and villas in Dubai Sustainable City.
The Kingspan KoolDuct System was installed into Fanar, Islamic Cultural Centre in Doha, Qatar.
The Kingspan PalDuct PIR System was installed into the interior fit-out of the Dubai Mall.
The Kingspan KoolDuct System was installed into Muscat International Airport.
Kingspan PalDuct Hydro was Installed into the Khalifa University Campus Extension.
The Kingspan PalDuct PIR System was used throughout the club house of the Arabian Ranches Golf Club.
Kingspan PalDuct Phenolic pre-insulated ducting has been installed in the St. Regis, Amman.
Kingspan PalDuct PIR pre-insulated ducting has been installed in Nation Towers, Abu Dhabi
Kingspan PalDuct PIR pre-insulated ducting has been installed in the World Trade Center Doha, Qatar.
Kingspan PalDuct Hydro pre-insulated ducting has been installed in the Four Seasons Hotel, Abu Dhabi.
The Kingspan KoolDuct System was installed into the Four Seasons hotel in Doha, Qatar
The Kingspan KoolDuct System was installed on one of U.A.E.’s most recognisable landmarks, Atlantis, The Palm Hotel.