Ductwork Case Studies

Floating Seahorse exterior

The Heart of Europe

Kingspan PalDuct system is installed into The Heart of Europe, Dubai.

Kingspan PalDuct Phenolic system is installed into Water’s Edge, Yas Island Abu Dhabi.

Water’s Edge, Yas Island, Abu Dhabi, UAE

Kingspan PalDuct Phenolic system is installed into Water’s Edge, Yas Island Abu Dhabi.

Kingspan PalDuct Phenolic system is installed into AKOYA, Dubai.

AKOYA, Dubai

Kingspan PalDuct Phenolic system is installed into AKOYA, Dubai.

Kingspan PalDuct Phenolic system is installed into DT1 Residential Tower, Downtown Dubai.

DT1 Residential Tower

Kingspan PalDuct Phenolic system is installed into DT1 Residential Tower, Downtown Dubai.

20,000 m2 of the Kingspan PalDuct PIR was installed into the 500 townhouses and villas in Dubai Sustainable City.

The Dubai Sustainable City

20,000 m2 of the Kingspan PalDuct PIR was installed into the 500 townhouses and villas in Dubai Sustainable City.

Kingspan KoolDuct System was installed into Fanar, Islamic Cultural Centre in Doha, Qatar.

Fanar, Islamic Cultural Centre

The Kingspan KoolDuct System was installed into Fanar, Islamic Cultural Centre in Doha, Qatar.

Kingspan PalDuct PIR System was installed into the interior fit-out of the Dubai Mall.

The Dubai Mall

The Kingspan PalDuct PIR System was installed into the interior fit-out of the Dubai Mall.

Kingspan KoolDuct System was installed into Muscat International Airport.

Muscat International Airport

The Kingspan KoolDuct System was installed into Muscat International Airport.

Kingspan PalDuct Hydro was Installed into the Khalifa University Campus Extension.

Khalifa University Campus Extension

Kingspan PalDuct Hydro was Installed into the Khalifa University Campus Extension.

Kingspan PalDuct PIR System was used throughout the clubhouse of the Arabian Ranches Golf Club.

Arabian Ranches Golf Club

The Kingspan PalDuct PIR System was used throughout the club house of the Arabian Ranches Golf Club.

Kingspan PalDuct Phenolic pre-insulated ducting has been installed in the St. Regis, Amman.

St. Regis, Amman

Kingspan PalDuct Phenolic pre-insulated ducting has been installed in the St. Regis, Amman.

Kingspan PalDuct PIR pre-insulated ducting has been installed in Nation Towers, Abu Dhabi

Nation Towers

Kingspan PalDuct PIR pre-insulated ducting has been installed in Nation Towers, Abu Dhabi

Kingspan PalDuct PIR pre-insulated ducting has been installed in the World Trade Center Doha, Qatar

World Trade Center Doha

Kingspan PalDuct PIR pre-insulated ducting has been installed in the World Trade Center Doha, Qatar.

Kingspan PalDuct Hydro pre-insulated ducting has been installed in the Four Seasons Hotel, Abu Dhabi.

Four Seasons Hotel - Al Maryah Island

Kingspan PalDuct Hydro pre-insulated ducting has been installed in the Four Seasons Hotel, Abu Dhabi.

Kingspan KoolDuct System was installed into the Four Seasons hotel in Doha, Qatar

Four Seasons Hotel, Doha

The Kingspan KoolDuct System was installed into the Four Seasons hotel in Doha, Qatar

Kingspan KoolDuct System was installed on one of U.A.E.’s most recognisable landmarks, Atlantis, The Palm Hotel.

Atlantis, The Palm

The Kingspan KoolDuct System was installed on one of U.A.E.’s most recognisable landmarks, Atlantis, The Palm Hotel.

1 2