Pannal Water Tower

Products from our Kooltherm and Therma ranges have helped to transform a derelict water tower in North Yorkshire into a striking family home.

The Project

Built in the late 1930s, Pannal Water Tower provided clean water to the nearby village of Kirkby Overblow for three decades before being abandoned when the Harrogate water board extended its supply. Despite having stood as an empty shell for over 50 years, Carol and Majid Nadry were inspired by the tower’s industrial charm and stunning natural location, and bought it at auction with the ambition to turn it into a home for themselves and their youngest daughter.

Location:
Kirkby Overblow, North Yorkshire
Products:
Kingspan Kooltherm K8 Cavity Board, Kooltherm K12 Framing Board, Thermafloor TF70
Additional information:
Featured on Channel 4's 'Restoration Man'

However, as with any conversion of an industrial building into a domestic dwelling, there were some inherent design issues that needed to be considered. Whilst ceiling height wasn’t an issue in the 46 ft tower, the narrowness of its footprint meant that the width of the walls needed to be kept to a minimum in order to maximise the liveable space. This led to the specification of Kingspan Kooltherm K12 Framing Board.

We were concerned that when we came to insulate the tower, we would lose valuable space from the rooms we had created within the structure. The Kingspan Kooltherm range was a lot thinner than other types of insulation, but still offered a high level of thermal performance which would allow us to meet the building regulation requirements.

Carol Nadry - Project manager and homeowner

Timber studwork was installed on the inner face of the brick external walls. 50 mm thick Kingspan Kooltherm K12 Framing Boards were then installed between the battens. The insulation boards offered a lightweight solution which could easily be cut to size.

The Nadrys also constructed a low-level extension for the tower to provide additional living space. To insulate the cavity walled construction of the extension they installed 50 mm Kingspan Kooltherm K8 Cavity Board.

Additionally, to avoid the need for wall mounted radiators within the main water tower, underfloor heating was installed on every floor of the building. To help retain the heat in the floor space above, Kingspan Thermafloor TF70 floor insulation was installed beneath the heating pipes on every floor.

CaseStudy_WaterTower_02_K8_K12_TR70_UK.jpg

Related products

Kingspan Insulation Ltd

For queries relating to insulation boards, cavity closers or membranes.

Pembridge

Leominster

Herefordshire

HR6 9LA

General enquiries: 01544 388 601

Technical advice: 01544 387 382

We use cookies on our website www.kingspan.com. To find out more about the cookies we use, or to change your cookie preferences i.e. to remove your consent to our use of certain categories of cookies, please visit our Cookie Policy & Control page.

Please click "Accept and close" to accept the use of cookies on our website. If you do not click "Accept and close" but continue to use this website: you thereby consent to the use of all Kingspan's cookies and third party cookies for the purposes of improving performance, improving functionality and audience measurement, in accordance with the terms laid out in our Cookie Policy & Control page; and we will assume that you have read and understood our Cookie Policy & Control page.