Case studies

Our Projects

As the UK’s leading supplier of engineered timber systems across a broad spectrum of construction sectors – we deliver an enviable range of high performance, energy efficient solutions into private and affordable housing as well as the commercial and public sectors. Take a look at our case studies below.

Image_Case Study_Honington Primary School_4

Honington Primary School

Speed was the primary driver to deliver a new teaching facility for the start of term.

Image_Case Study_Ninewells_3

Ninewells

Ninewells is a brand new development creating 162 new dwellings in Cambridge.

Image_Case Study_Deasy Road_3

Deasy Road

A fast track programme on a confined urban site.

Image_Case Study_Castle Street_1

Castle Street Dover

Kingspan TEK®’s high performance capabilities and impressive air tightness was the fabric of their choice on this build. Also the speed of build was a huge factor allowing local people to move into their new homes far quicker than a traditionally built development.

Image_Case Study_Havering Garages_5

Havering Garages

A major regeneration project in the London Borough of Havering on 25 redundant garage sites.

Image_Case Study_Oaks Day Nursery_4

Oaks Day Nursery

A brand new, fit for purpose nursery to replace the inadequate, temporary buildings that had stood for many years.

Image_Case Study_Hanham Hall_5

Hanham Hall

Hanham Hall is the first site in the government’s Carbon Challenge initiative.

Image_Case Study_William Street Qt_6

William Street Quarter

Comprising 201 affordable homes with a mix of one, two, three and four bed accommodation

Image_Case Study_Premier Inn_1

Premier Inn

Kingspan Timber Solutions were asked to consider a timber frame construction for this 6 storey hotel and restaurant.

Image_Case Study_Manor School_5

Manor School

Kingspan Timber Solutions were appointed in the construction of a new teaching block consisting of 6 new classrooms, a hall, offices and toilet facilities, which was located on an existing playground and caretaker hut.

Image_Case Study_Latis Hayes_1

Hayes Middlesex

A high spec development of 14 houses on a tight urban site.

Image_Show Home_Elsworth_6

Elsworth Show Home

The Kingspan TEK Building System was used to create a contemporary show home at Potton's Self Build Show Centre in Cambridgeshire - the UK's first show home built to Passivhaus standard.

Image_Case Study_Anglo European School_3

Anglo European School

Kingspan Timber Solutions was commissioned by principal contractor T J Evers on behalf of Anglo European School to provide a cost effective, time efficient and sustainable solution to the continuing redevelopment of Anglo European School, Ingatestone, Essex.

DSC_0237

Leigh Mental Health Facility

The 5 Boroughs Partnership – an organisation that provides specialist mental health and learning disability services to the residents of Wigan – launched plans for a new development of a £40million mental health facility, designed to accommodate up to 48 patients.

Image_Case Study_Latis Hoddesdon_1

Stanboroughs Conservative Club

A contemporary building design which is sensitive to its historical context, located within a Conservation Area.

Image_Case Study_Centre Parcs_1

Center Parcs Woburn

In December 2004, Center Parcs announced that it had identified a location for a fifth UK site, at Warren Wood near Flitwick, Bedfordshire. Center Parcs Woburn Forest is a £250 million development, one of the largest leisure projects in the UK.

Kingspan Timber Solutions Ltd

Please contact us to discuss your project

Eltisley Road

Great Gransden

Sandy

Bedfordshire

SG19 3AR

01767 676400

We use cookies on our website www.kingspan.com. To find out more about the cookies we use, or to change your cookie preferences i.e. to remove your consent to our use of certain categories of cookies, please visit our Cookie Policy & Control page.

Please click "Accept and close" to accept the use of cookies on our website. If you do not click "Accept and close" but continue to use this website: you thereby consent to the use of all Kingspan's cookies and third party cookies for the purposes of improving performance, improving functionality and audience measurement, in accordance with the terms laid out in our Cookie Policy & Control page; and we will assume that you have read and understood our Cookie Policy & Control page.