The Project

The key driver for the project was to provide local people access to mental health services in one convenient location at the heart of the Leigh East Community.

Location:
Manchester
Client:
The 5 Boroughs Partnership
Build System:
Kingspan TEK Cladding Panel

The Challenge

The build is situated on what was formally Leigh East Amateur Rugby League ground. The 3.9 hectare site has been split into two separate buildings, providing a hub for the local community and high quality inpatient services for adults suffering from mental ill health, as well as dementia and memory conditions. As well as providing much needed jobs throughout the construction phase – with three in every four subcontractors working on the project living with a 30 mile radius. The project is also designed to boost the local economy by providing work for not only mental health staff but also supporting roles.

It was rewarding to be involved with such a landmark building that is now a world leader in providing the best quality mental health care, learning disability support and community services, with a reputation for innovation and excellence.

Ian Loughnane, Business Unit Director, Kingspan Timber Solutions

The Solution

Leigh Mental Health Facility

Kingspan Timber Solutions were selected to provide their Kingspan TEK® and Kingspan TEK® Cladding for the project. Kingspan TEK® was used as part of a hybrid structural frame solution for the first phase of the project. The Kingspan TEK® Building System comprises 142mm or 172mm thick structural insulated panels connected with a unique jointing system for walls and roofs.

The second phase of the project comprised a combination of steel frame and Kingspan TEK® cladding panels. This cladding panel solution is an innovative Structural Insulated Panel System (SIPs) – capable of cladding any structure, not just steel but also timber and concrete. The panels were manufactured to suit the individual project needs. Each panel has a standard dimension of width of 200mm (minimum), 1,220mm (maximum) and a length of 7,500mm (maximum) – pre-assembled prior to delivery in the factory using Kingspan TEK’s® unique jointing system.

The panels – consisting of a high performance rigid urethane insulation core, sandwiched between two layers of 15mm oriented strand board (OSB) – were assembled in the Kingspan Timber Solution’s factory to form large elements for efficient crane erection and deliver key benefits including:

  • Exceptional thermal performance with wall and roof U-Values of 0.21 – 0.10 W/m2K with typical Y-Values ranging from 0.05 – 0.01
  • Highly airtight construction can achieve air permeability of less than 1 m3/hr.m2 at 50 Pa.
  • Panels are PEFC and FSC Chain of Custody certified
  • The proprietary jointing system used with the Kingspan TEK® Building System creates an incredibly airtight structure which can achieve 1.0 m3/hr.m2 @ 50 Pa.
  • Kingspan TEK® Building System is a Passivhaus Institute Certified Building System
  • British Board of Agrément (BBA) Approval Inspection Testing Certificate
  • NSAI Agrément Certification

Both Kingspan TEK® systems were specified by the architect from the outset due to their many benefits. One of the reasons that the Kingspan TEK® cladding panels were selected was their lightweight structure that enables a fast track building process – helping to reduce construction time. A three man team can typically install 150m2 of Kingspan TEK® Cladding Panels per day, allowing follow-on trades to commence work sooner, once panels are erected and wrapped with a breathable membrane. Both systems also offer excellent thermal and airtightness performances which were ideal for this build.

There were a number of challenges during the build for Kingspan Timber Solutions, these included the integration of M + E work, coordination of the detailing and achieving the erection of the scheme in such a tight timescale. Kingspan Timber Solutions were able to overcome these challenges though leasing closely with the design time as well as using 3D modelling which ultimately helped coordination of the detailing. Thorough communication with the onsite contracts team to maintain the build flow and react positively to any issues arising.

5 Borough Partnership wanted to ensure service users and carers were involved in the design of the build, in order to achieve this, regular meetings were held to look at ongoing plans and where appropriate, 5 Borough Partnership made changes in line with the feedback.

The finished site allows adult patient services to be moved from Leigh Infirmary to the new building where men and women are able to have separate areas. Each patient staying in the hospital is also provided with their own bathroom – something that is not able to be offered in their current accommodation in Leigh Infermary.

The highlights of this project for Kingspan Timber Solutions was achieving successful site operation and delivering the finished building to programme and as designed.

Kingspan Timber Solutions is project and performance centric. Through an extensive product portfolio, the company’s focus is firmly on value engineering and performance. With a collaborative culture, Kingspan Timber Solutions are dependable construction partners who, by using a combination of the highest performing, most sustainable materials and components, design, manufacturer, assemble and project manage the construction of cutting-edge timber solutions. Their systems also include timber frame, structural insulated panel systems (SIPs), glued laminated timber (glulam) and cross laminated timber (CLT).

Download
Image_Case Study_Leigh Mental Health_1

Kingspan Timber Solutions Ltd

Please contact us to discuss your project

Eltisley Road

Great Gransden

Sandy

Bedfordshire

SG19 3AR

01767 676400

We use cookies on our website www.kingspan.com. To find out more about the cookies we use, or to change your cookie preferences i.e. to remove your consent to our use of certain categories of cookies, please visit our Cookie Policy & Control page.

Please click "Accept and close" to accept the use of cookies on our website. If you do not click "Accept and close" but continue to use this website: you thereby consent to the use of all Kingspan's cookies and third party cookies for the purposes of improving performance, improving functionality and audience measurement, in accordance with the terms laid out in our Cookie Policy & Control page; and we will assume that you have read and understood our Cookie Policy & Control page.