Image_Case Study_Latis Hayes_3

Hayes Middlesex

A high spec development of 14 houses on a tight urban site.

The Project

Kingspan Timber Solutions were chosen to provide the high performance factory insulated timber frame kits for this high spec development of 14 houses on a tight urban site, where pre fabrication offered good time and space saving advantages over masonry build.

Client:
Latis Group
Architect:
Latis Group
Build System:
Timber Frame

The Challenge

Kingspan Timber Solutions worked with the architects to achieve the desired high thermal efficiency of the building fabric, and with the incorporation of the Lifetime Homes requirements to help achieve the Code for Sustainable Homes Level 4 requirements specified. The build on site went very smoothly due to the level of interaction and coordination between the architects and the Kingspan Timber Solutions design team. The developers positive experience on this project has made timber frame their primary construction method.

Download
Image_Case Study_Latis Hayes_1

Kingspan Timber Solutions Ltd

Please contact us to discuss your project

Eltisley Road

Great Gransden

Sandy

Bedfordshire

SG19 3AR

01767 676400

We use cookies on our website www.kingspan.com. To find out more about the cookies we use, or to change your cookie preferences i.e. to remove your consent to our use of certain categories of cookies, please visit our Cookie Policy & Control page.

Please click "Accept and close" to accept the use of cookies on our website. If you do not click "Accept and close" but continue to use this website: you thereby consent to the use of all Kingspan's cookies and third party cookies for the purposes of improving performance, improving functionality and audience measurement, in accordance with the terms laid out in our Cookie Policy & Control page; and we will assume that you have read and understood our Cookie Policy & Control page.