HeronTower_London_Interior_7_PSA_RMG600_UK

Case Studies

The world walks on our floors

You'll find Kingspan Access Floors installed in offices, data centres, dealing rooms, call centres and retail premises throughout the world. Here, you'll find some of our recently completed projects where we've installed our raised access floors. You can select them individually or filter by building type.
 

110 Bishopsgate_Heron Tower_London_Exterior_Day_2_Credit_Shutterstock.com

110 Bishopsgate

110 Bishopsgate, informally known as Heron Tower is a £47million skyscraper owned by Heron International in the City of London. It stands 230 metres tall, including its 28 metre mast, or 202 metres (663 ft) excluding the mast - making it the tallest building in London’s financial district.

20 Fenchurch Street_London_Exterior_Top_Day_Landscape

20 Fenchurch Street

20 Fenchurch Street is a 34-storey mixed use office building boasting London’s highest public green space, café, bar and restaurant. The iconic postmodern building was designed by architect, Rafael Viñoly and was completed in 2014.

The_Scalpel_Exterior_London_UK_KAF_Case_Study_2

52 Lime Street

52 Lime Street, informally known as “The Scalpel” accommodates the European headquarters of the global insurance business, W. R. Berkley Corporation, and was developed by its UK-based development arm.

Admiral HQ _Alamy_crop-1

Admiral Insurance Group

Admiral Insurance Group’s new 11-storey head office is situated in a regeneration area of Cardiff city centre. The new headquarters enabled the group to bring all 2,000 of their staff into one building, with capacity to accommodate a total of 3,000 people.

Alchemia_Titanium_Gdansk_Poland_Interior_KAF_Case_Study_3

Alchemia II Titanium Building - Poland

The set of buildings collectively called ‘Alchemia’ is home to the European headquarters for State Street, a US-based financial services institution in Gdańsk, Poland. The second phase of the project, ‘Alchemia II’ was completed in 2016.

BankMuscat_Oman_Night

BankMuscat - Oman

BankMuscat is the leading financial services provider in Oman. The company’s iconic headquarters completed in 2010 marries futuristic design and traditional Omani architecture.

KAF_BBVA Bank HQ_Madrid_Spain_Case Study_2

BBVA Bank - Spain

Banco Bilbao Vizcaya Argentaria, S.A. (BBVA) is a multinational Spanish banking group. The bank’s head office is known as “La Vela” (“The Sail”) due to its high oval tower. The building was completed in 2015 in the new urban development to the north of Madrid.

Blue Fin Building at night

Blue Fin Building

The Blue Fin Building, also known as Bankside 1 was completed in 2008. The marquee building was the winner of the BCO Best Corporate Workplace award in the same year it opened.

BrentCivicCentre_London_Exterior_1_PSA_RMG600_UK

Brent Civic Centre

Completed in 2013, Brent Civic Centre in Wembley houses Brent Council’s offices and public facilities, including Wembley Library, the busiest reading room in London and third most used in Britain.

Broadgate_London_CaseStudy_UK_7_Crop

Broadgate Tower

Completed in 2011, Broadgate Tower stands within the renowned Broadgate business district in the City of London. At 33 stories, Broadgate Tower is one of London’s tallest buildings.

CannonPlace_London_Exterior_Day_UK

Cannon Place

Built over eight floors, Cannon Place delivers highly specified, contemporary Class A space in Hampstead. Each floor offers virtually column-free space with uninterrupted light. The landmark building was completed in 2013.

CityofYorkCouncil_York_Exterior2_CaseStudy_BSEN_RG2_CDEC30_UK

City of York Council

York’s former railway station has been transformed to create modern office accommodation for City of York Council. The Council’s new ‘West Offices’ were opened officially in 2013.

KAF_Coca-Cola_Madrid_Spain_Exterior_Case Study_BSEN_1

Coca-Cola HQ - Spain

Coca-Cola unveiled its Iberia Business Unit headquarters building in Madrid in 2009. In order to meet company-wide sustainability criteria, the building is designed to improve energy efficiency and reduce dependence on grid electricity for heat and power.

Edificio_Portico_Madrid_Spain_Exterior_Day_CaseStudy_BSEN_1_Credit_Joe_Aker

Edificio Pórtico - Spain

Edificio Pórtico is an eight-story, Class A office building in Madrid. The building is the headquarters of Grupo Marsans, the Spanish tourism and transportation corporation. It is situated at the entrance to the Campo de las Naciones business park. The project picked up a MIPIM Award in the ‘Business Center’ category.

KAF_Electro Business Centre_St Petersburg_Russia_Exterior_Dusk_Case Study_UK

Electro Business Centre - Russia

Due to rapid development and a need for new business accommodation in St Petersburg, this landmark office project, Electro Business Centre, was fast-tracked.

Equinix_Datacentre_Slough_CaseStudy_FDEB38_UK

Equinix LD5

Equinix LD5 is located in Slough and is one of the state-of-the-art International Business Exchange (IBX) centres in the UK. It offers a full range of premium co-location, interconnection and support services to a wide range of secure digital ecosystems.

KAF_Etihad Airways HQ_Abu Dhabi_UAE_Exterior_Day_DRF Simploc_Case Study_UK

Etihad Airways - Abu Dhabi

Etihad Airways, the national flag carrier airline of the U.A.E. has its head office in Khalifa City near Abu Dhabi International Airport. Etihad spent £32.3million to build its new head office and training centre, which was completed in 2007.

HPDataCentre_Wynyard_Exterior_PSA_RG_FDEB_UK

HP Wynyard Data Centre

HP's data centre in Wynyard, near Newcastle is among the most efficient in the world, thanks to its use of North Sea air cooling rather than refrigeration to keep servers cool.

ICDAS_Plaza_Istanbul_Turkey_Interior_KAF_Case_Study_8

İÇDAŞ Plaza - Turkey

İÇDAŞ Plaza is the headquarters of İÇDAŞ, the Turkish manufacturer of construction and alloyed steel and was completed in 2015.

KKB_Istanbul_Turkey_Interior_KAF_Case_Study_2

Kredi Kayit Burosu - Turkey

Kredi Kayıt Bürosu (KKB) is Turkey’s “first and only” credit bureau. Working with banks and consumer finance institutions, they develop products and services that reduce credit risk. Their headquarter building in Istanbul was completed in 2016.

Lambeth_College_London_CaseStudy_FDEB30_UK

Lambeth College

Lambeth College forms part of a £61 million redevelopment of its sites at Brixton, Clapham and Vauxhall. The first phase saw the construction of a new sixth form building at the Clapham Centre.

Leadenhall_Building_London_Exterior_Day_UK_Credit_Shutterstock.com

Leadenhall Building

The Leadenhall Building, also known as “The Cheesegrater” was completed in 2014. The 48-storey skyscraper has become an iconic part of the London skyline. The building was named, ‘City of London Building of the Year’ by the Worshipful Company of Chartered Architects in 2015.

LeedsDC1_Leeds_Exterior_1_CaseStudy_PSA_FDEB38_UK

Leeds DC1

Cornelius House (also known as Leeds DC1) was the first major independent data centre and the largest of its kind outside of London.

LiverpoolCentralLibrary_Liverpool_Exterior_CaseStudy_PSA_DRF600_UK

Liverpool Central Library

After three years and a £55million refurbishment, the Liverpool Central Library reopened in 2013. The redevelopment aimed to strike a balance between restoring the grade II listed buildings and introducing new 21st century spaces.

KAF_Main Point_Prague_Czech Republic_Exterior_Day_BSEN_RG2_4-1

Main Point - Czech Republic

Completed in 2012, Main Point accommodates the Kooperativa and CPP insurance companies, which are both part of the Vienna Insurance Group. We supplied 19,500sq m of RG2 panels to Prointerier who fitted out Main Point, this 10 storey office building in Prague.

Midtown_Gibraltar_Exterior_KAF_Case_Study_1

Midtown Phase 1 - Gibraltar

Phase 1 of the Midtown development delivers over 7,000 sq. m. of premium office space, with Phase 2 offering a further 11,000 sq. m. to follow.

1&2 New Ludgate_London_Exterior_Day_PSA_RMG600_UK_2 Credit_Pawel_Pajor_Shutterstock.com

New Ludgate

One & Two New Ludgate is a £260 million mixed use building scheme located next to the Old Bailey in the City of London. It was the only major speculative office building to complete in 2015. One & Two New Ludgate were designed to replace aging commercial properties.

Newman_University_College_Birmingham_CaseStudy_Exterior_DRF600_UK

Newman University College

Newman University invested £20million in redeveloping parts of the campus, including a new state-of-the-art library, entrance (St Chad Building) and teaching spaces, all of which were completed in 2012.

Angel_Court_London_Interior_The_Garden_Floors_UK_KAF_Case_Study

One Angel Court

One Angel Court is a grade A office space in Throgmorton Street, London, UK offering large floor plates throughout and benefits from a number of terraces and outdoor spaces.

OneNewChange_London_CaseStudy_RG_PSA_RMG600_UK

One New Change

One New Change is an eight-storey mixed use office building boasting superb views of St Paul’s Cathedral and the City of London. The iconic modernist building was designed by Pritzker Prize-winning architect, Jean Nouvel and was completed in 2010.

National_Palace_Prague_Czech_Republic_Exterior_KAF_Case_Study_2

Palac Narodni - Czech Republic

Palac Narodni (National Palace) is a mixed-use building in Prague, Czech Republic and was completed in 2017. It has been designed to respect the site’s historical significance, which dates back to the 14th Century.

KAF_Tripark_Madrid_Spain_Exterior_Architect_Case Study_RG_BSEN_RG3

Parque Empresarial Tripark - Spain

Parque Empresarial Tripark Las Rozas is a 33,000 sq m office complex located in north west Madrid. It was the first building in Spain to achieve LEED (Leadership in Energy and Environmental Design) Gold in 2010.

Project_Verde_London_UK_Interior_KAF_Case_Study_Main

Principal Place

Principal Place Commercial development is a 16 storey mixed-use Grade A Building, located in the London Borough of Hackney, positioned between the City of London and the vibrant, creative Shoreditch area.

Q22_Warsaw_Poland_Interior_KAF_Case_Study_3

Q22 - Poland

Q22 is a 39-storey commercial office building in Warsaw, Poland, housing Deloitte Polska. The building is constructed with the highest quality materials and technology solutions ensuring Q22 is “unique, luminous and modern”.

KAF_Samsung Engineering_Moscow_Russia_Exterior_Day_Case Study_RG2_UK

Samsung Electronics - Russia

Samsung Electronics Co., Ltd. is a global leader in semiconductor, telecommunication, digital media and digital convergence technologies. The company's main headquarters in Russia was refurbished making extensive use of Kingspan Access Floors.

Sixty London_Amazon_London_Exterior_Day_PSA_RMG600_DRF600_UK_1 Credit - David Burrows _ Shutterstock.com

Sixty London

Sixty London at 60 Holborn Viaduct is a 210,000 sq ft office building completed in 2013. The building is built to high sustainability standards achieving BREEAM ‘Excellent’ status.

Swiss Federal Building_Berne_Switzerland_Exterior_Day_Case Study_RG_BSEN_RG2_2

Swiss Federal Office for Buildings and Logistics - Switzerland

The administrative building of the Federal Office for Buildings and Logistics in Berne, Switzerland was completed in 2010.

Tekfen_Tower_Istanbul_Turkey_Exterior_KAF_Case_Study_1

Tekfen Tower - Turkey

Tekfen Tower is a 26-storey premium-grade building, located in the strategic and prestigious Levent district of Istanbul, Turkey. Completed in 2017, the extension to Tekfen Tower establishes a new standard in the Istanbul office market.

TIQ_London_UK_Exterior_KAF_Case_Study_1

The International Quarter (TIQ)

The International Quarter (TIQ) is London's newest and most progressive business district delivering a lasting legacy for East London's economy.

TV_Centre_London_UK_Interior_KAF_Case_Study_1

TV Centre London

Main contractor, Mace worked in collaboration with English Heritage to ensure Television Centre's famous Helios building, along with the courtyard and atomic dot wall Studio One, were carefully refurbished while preserving many other original features of the iconic former BBC building.

Unilever_London_Exterior_CaseStudy_RG_PSA_RMG600_UK

Unilever

Completed in 2008, Unilever House which overlooks the Blackfriars Bridge and the River Thames at London's Victoria Embankment was a major refurbishment of this iconic 8-storey building originally built in 1931.

Jubilee Campus_Nottingham_UK_2_KAF_MH-NOTT-0008_Credit_Dennis Gilbert_VIEW

University of Nottingham - TEC

The Technology Entrepreneurship Centre (TEC) is a new 2,000m² BREEAM Excellent 3-storey office building based at The University of Nottingham Innovation Park and is the focal-point of the University's Enterprise Zone.

White_City_Place_London_Interior_UK_KAF_Case_Study_2

White City Place - Westworks

White City Place is a new and exciting business district, covering 17 acres in regenerated White City. The development includes more than 400,000 sq. ft. of new offices at Television Centre, finished to a Grade A standard.

Yargici_HQ_Istanbul_Turkey_Interior_KAF_1_Credit_LAMP83

YARGICI - Turkey

YARGICI is one of the best known names in the Turkish fashion industry. Their head office incorporating the company’s flagship store, built in Beyoglu, Istanbul was completed in 2016.

We use cookies on our website www.kingspan.com. To find out more about the cookies we use, or to change your cookie preferences i.e. to remove your consent to our use of certain categories of cookies, please visit our Cookie Policy & Control page.

Please click "Accept and close" to accept the use of cookies on our website. If you do not click "Accept and close" but continue to use this website: you thereby consent to the use of all Kingspan's cookies and third party cookies for the purposes of improving performance, improving functionality and audience measurement, in accordance with the terms laid out in our Cookie Policy & Control page; and we will assume that you have read and understood our Cookie Policy & Control page.