Bloomberg_London_CaseStudy__KAF_UK35

Bloomberg

Iconic London building

Bloomberg’s European Headquarters opened with excitement in October 2017. The marquee building in the heart of London provides new office space for Bloomberg’s 4000 London based employees. Located between the Bank of England and St Paul’s Cathedral the building was conceived together by Mike Bloomberg and Lord Norman Foster of Foster + Partners and delivered by Sir Robert McAlpine and Stanhope plc.

The Project

The completion of this iconic, high specification building marks the culmination of years of planning and development for both Bloomberg, its partners and Kingspan Access Floors. 

Set in a 3.2 acre site, the development displays architectural innovation, artistic flair and historical references whilst delivering 98.5% score against the BREEAM sustainability assessment method: the highest design-stage score ever achieved by any major office development.

The installation of 37,000m2 of Kingspan raised access flooring and 34,000m2 of Kingspan Attiro real wood engineered floor covering is a landmark project for Kingspan Access Floors. The combined systems allow quick and easy access to the steel encapsulated floor panels and the underfloor void. 

Owner:
Bloomberg
Location:
Cannon St, London
System Size:
37,000 sq m
Floor finish:
34,000 sq m
Completion:
October 2017
Contractor:
Sir Robert McAlpine
Project Manager:
Stanhope plc

Products used in this building

Related case studies