Case studies

CaseStudy_Durrington_04_TEK_UK

Durrington High School

The Kingspan TEK Cladding Panel was specified at Durrington High School to help target a BREEAM ‘Very Good’ rating and to achieve excellent fabric performance against a tight project deadline.

Haggerston_Castle_TEK

Haggerston Castle Holiday Park

Holiday-home owners at Haggerston Castle Holiday Park in Northumberland are relaxing in style at the Park’s new owners’ lounge, constructed from the Kingspan TEK Building System during the short off-season period.

CaseStudy_Lewes_01_TEK_UK.jpg

The Gateway to Lewes

The Kingspan TEK Building System has been used on a narrow plot, featured on Grand Designs.

CaseStudy_Swavesey_TEK_03_UK.jpg

Swavesey Village College

The Kingspan TEK Building was used to create the building envelope of a contemporary, energy efficient sports hall and classroom block at Swavesey Village College.

CaseStudy_Potton_01_TEK_UK.jpg

Elsworth Show Home

The Kingspan TEK Building System was to create a contemporary show home that blends ambitious architectural design with the meticulous energy efficiency requirements of the Passivhaus Standard.

CaseStudy_TheWord_03_TEK.jpg

The Word

South Shields is benefitting from a £16 million cultural centre featuring an iconic circular façade created with the Kingspan TEK Cladding Panel.

CaseStudy_AtherleighPark_02_TEK

Atherleigh Park

The Kingspan TEK Cladding Panel and Kingspan TEK Building System have been used as part of an innovative £40 million mental health facility in the heart of Greater Manchester.

CaseStudy_GourmetSki_03_TEK_UK.jpg

Chalet du Chene

The Kingspan TEK Building System has been installed as part of a luxury ski chalet in the French Alps, helping the project to be completed within the tight schedule of the Alpine building season.

CaseStudy_AlexandraRoad_03_TEK_UK.jpg

Alexandra Road

A stylish Passivhaus home in South Manchester has achieved exceptional levels of airtightness through a combination of careful detailing and a high performance structure.

CaseStudy_Greenhauses_03_TEK_K3_K12_UK.jpg

The Greenhauses

Kingspan TEK Building System and Cladding Panel were used alongside the Kooltherm K-range on London’s largest Passivhaus development.

CaseStudy_SeatonJurassic_02_TEK_UK.jpg

Seaton Jurassic Visitor Centre

The Kingspan TEK Building System and Kingspan TEK Cladding Panel have been installed as part of the new Seaton Jurassic visitor centre in Devon, forming the gateway to the region’s historic Jurassic Coast.

CaseStudy_Mitcham_01_TEK_UK.jpg

Tramway Path

A new apartment building in London has shown that even on tight plots, there’s no need to compromise on quality to meet the ongoing housing shortage.

CaseStudy_RADBuilding_05_TEK_UK

RAD Building

Kingspan TEK Cladding Panel has been included as part of the innovative design for the Research Acceleration and Demonstration (RAD) Building at The University of Nottingham.

CaseStudy_JerseyEnerPhit_01_TEK_UK.jpg

Jersey EnerPHit

A 1960s bungalow is expected to become Jersey’s first EnerPHit certified home thanks to an extensive refurbishment, featuring the Kingspan TEK Building System.

CaseStudy_Stonehenge_01_TEK_TT47_UK.jpg

Stonehenge Visitor Centre

The largest construction project Stonehenge has seen for several millennia was completed in December 2013 with the opening of the prestigious new visitor centre.

CaseStudy_BoylePetyt_03_TEK_UK.jpg

Boyle and Petyt Primary School

The Kingspan TEK Building System has been installed as part of a modern, energy efficient classroom block at Boyle and Petyt Primary School in the Yorkshire Dales, helping the school to meet its strict funding deadline with a nine day construction programme.

1 2 3 4 5 6 7