Case studies

Filter the case studies

CaseStudy_ReedsMill_01_K7_K12_K18_TF70_UK.jpg

Reeds Mill

Over 900 m² of Kooltherm and Therma products were installed as part of the restoration of a 19th century windmill, as featured on Channel 4’s Restoration Man series.

CaseStudy_BoroughGrove_01_K5_UK.jpg

Borough Grove

Kingspan Kooltherm K5 External Wall Board was installed as part of a refurbishment scheme in Hampshire.

CaseStudy_BFI_02_K3_UK.jpg

BFI Master Film Store

Kingspan Kooltherm was used to help protect some of the country’s most prized cinema heritage.

CaseStudy_MossBank_04_K5_UK.jpg

Moss Bank

Kingspan Kooltherm K5 External Wall Board was used to give a new lease of life to over 100 pre-fabricated British Iron and Steel Federation homes.

CaseStudy_RSPB_01_TR27_TT47_UK.jpg

RSPB Rainham Marshes

A building for bird enthusiasts, which nests on a windswept site at the edge of medieval Rainham Marshes on the Thames, is benefiting from our high performance roof insulation.

CaseStudy_RWCMD_01_TT46_UK.jpg

Royal Welsh College of Music and Drama

Kingspan Thermataper TT46 LPC/FM was specified for a world-class performance space in Cardiff.

CaseStudy_OasisAcademy_01_TT47_UK.jpg

Oasis Academy

Pupils at Oasis Academy in Immingham have reportedly been amazed by the facilities on show at their new school.

CaseStudy_Excel_01_TR26_UK.jpg

ExCeL London

Kingspan Thermaroof TR26 LPC/FM was used on the £165 million Phase II expansion of London’s first ICC and world-class exhibition and conference venue.

CaseStudy_TheOval_K10_UK (1)

The Kia Oval

Our premium performance rigid phenolic insulation manufactured was chosen for the £25 million redevelopment of the Vauxhall end of The Kia Oval.

Admiral HQ _Alamy_crop-1

Admiral Insurance Group

Admiral Insurance Group’s new 11-storey head office is situated in a regeneration area of Cardiff city centre. The new headquarters enabled the group to bring all 2,000 of their staff into one building, with capacity to accommodate a total of 3,000 people.

1&2 New Ludgate_London_Exterior_Day_PSA_RMG600_UK_2 Credit_Pawel_Pajor_Shutterstock.com

New Ludgate

One & Two New Ludgate is a £260 million mixed use building scheme located next to the Old Bailey in the City of London. It was the only major speculative office building to complete in 2015. One & Two New Ludgate were designed to replace aging commercial properties.

Sixty London_Amazon_London_Exterior_Day_PSA_RMG600_DRF600_UK_1 Credit - David Burrows _ Shutterstock.com

Sixty London

Sixty London at 60 Holborn Viaduct is a 210,000 sq ft office building completed in 2013. The building is built to high sustainability standards achieving BREEAM ‘Excellent’ status.

20 Fenchurch Street_London_Exterior_Top_Day_Landscape

20 Fenchurch Street

20 Fenchurch Street is a 34-storey mixed use office building boasting London’s highest public green space, café, bar and restaurant. The iconic postmodern building was designed by architect, Rafael Viñoly and was completed in 2014.

Leadenhall_Building_London_Exterior_Day_UK_Credit_Shutterstock.com

Leadenhall Building

The Leadenhall Building, also known as “The Cheesegrater” was completed in 2014. The 48-storey skyscraper has become an iconic part of the London skyline. The building was named, ‘City of London Building of the Year’ by the Worshipful Company of Chartered Architects in 2015.

Newman_University_College_Birmingham_CaseStudy_Exterior_DRF600_UK

Newman University College

Newman University invested £20million in redeveloping parts of the campus, including a new state-of-the-art library, entrance (St Chad Building) and teaching spaces, all of which were completed in 2012.

HPDataCentre_Wynyard_Exterior_PSA_RG_FDEB_UK

HP Wynyard Data Centre

HP's data centre in Wynyard, near Newcastle is among the most efficient in the world, thanks to its use of North Sea air cooling rather than refrigeration to keep servers cool.

20 21 22 23 24 25 26