Case studies

Filter the case studies

Kingspan Architectural Facades Systems project - APZ DriDesign Hungary Image

Autóipari Próbapálya Zala Test Track

A fantastic Dri-Design clad Z-shaped building graces the skyline within the APZ Vehicle Testing complex in Zalaegerszeg, Hungary.

Kingspan Architectural Facades Systems project - BINDER DE Image

Binder, Germany

A creative and textured façade using Dri-Design tapered cassettes.

A80J0001

Hotel Indigo

A new hotel designed to offer guests a contemporary boutique experience whilst honouring the rich heritage of Chester with a unique Corten-effect PPC facade– a first for Kingspan Facades.

Kingspan Architectural Facades Systems Project - Saint Priest FR Image

Kingspan Architectural Facades Systems Project - Saint Priest FR Image

Kingspan Light + Air reveals their new Head Office, built using QuadCore Evolution Recess and Dri-Design rainscreen facade.

20190716_102308

Royal Albert Dock

A new vision for London’s historic wharves sees an ambitious mixed-use development established along the waterfront, presenting attractive business opportunities within former derelict docklands. Kingspan Access Floors’ system was specified for the Grade A offices, helping them achieve a BREEAM rating of ‘Excellent’.

2019_KLA_Thermo_King_IRL

Thermo King

Thermo King Case Study

kLA-Cribbs-Causeway

Cribbs Causeway

Cribbs Causeway

Kingspan Architectural Facades Systems Project - Hwb Cyfle UK Image

Hwb Cyfle, Adult Day Care Centre

The new adult day care centre in Queensferry, Hwb Cyfle, replaces an older centre to provide a new state of the art facility. By using QuadCore Karrier system with Dri-Design rainscreen facade the new building is both aesthetically welcoming and extremely functional.

CaseStudy_ThePines_01_K15_UK

The Pines Primary School

The Pines Primary School has been purpose built to provide a flexible, adaptable and sustainable space for education, featuring premium performance rainscreen insulation.

CaseStudy_HeathSchool_01_K103_TP10_UK

The Heath School

New school design creates one unifying structure, built to the highest standards.

Kingspan Architectural Facades Systems Project - Grote Boel NL Image

Grote Boel Gymnasium

A fantastic new gym designed and built using green Tapered, Shadow and Flat Dri-Design complements the nearby trees in the local community of Grote Boel, Netherlands

Kingspan-LA-LK_plus_cut

Hambleton Group Ltd

Hambleton Group Ltd - Case Study

2018_kingspan_classic-domes_school-of-art-and-design-Hull_UK-(2)

Hull College Refurbishment

Hull College Refurbishment - The Complete Solution Achieved through Collaboration

CaseStudy_GreatMarlborough_02_K7_K107

6 Great Marlborough Street

A Victorian mill transformed into CAT-B office space with a retrofit featuring premium performance roof insulation.

CaseStudy_BeaufortHouse_02_K110PLUS_K118_UK

Beaufort House

A 1950’s office building has been transformed into a luxury apartment complex with a major refurbishment featuring insulated plasterboard and soffit insulation.

7117_004n

Southbank Place

With the rising trend of solo workers and small businesses wanting productive work environments in London, Kingspan Access Floors has helped to deliver inspiring, collaborative office spaces at Southbank Place.

1 2 3 4 5 6 7

We use cookies on our website www.kingspan.com. To find out more about the cookies we use, or to change your cookie preferences i.e. to remove your consent to our use of certain categories of cookies, please visit our Cookie Policy & Control page.

Please click "Accept and close" to accept the use of cookies on our website. If you do not click "Accept and close" but continue to use this website: you thereby consent to the use of all Kingspan's cookies and third party cookies for the purposes of improving performance, improving functionality and audience measurement, in accordance with the terms laid out in our Cookie Policy & Control page; and we will assume that you have read and understood our Cookie Policy & Control page.

The Cookie Policy & Control and Website Privacy Notice were updated on 13 August 2018.