The Project

LG Chem wanted the Holland factory to mirror the philosophy driving the Chevy Volt: sustainable, long-term efficiency, eye-catching style, and performance, all at a satisfactory cost. This 208,000+ square foot facility needed to be fully commissioned and functional within 15 months.

Associates of the project’s architectural firm, Rossetti, viewed the Kingspan Optimo wall panel when they visited Kingspan’s facility in Caledon, Ontario. They left feeling certain that the Optimo panel was the best product to be specified. It has tested R-values as high as 29, superior airtightness, and low thermal bridging. In comparison to conventional cavity-based insulation systems, Optimo ratings and features can bring a potential energy savings up to 30 percent.
 

Location:
Holland, Michigan, USA
Products:
Optimo

With nearly 208,000 square feet of Kingspan’s Optimo Smooth wall panels, in two different colors, and a fast track installation schedule, the LG Chem project was a challenging production. However from the onset, Kingspan’s engineering and sales teams were excellent in providing Universal Wall Systems with the information needed during the design phase, so we in turn could then provide the owner with the desired detailing.

Dan Hooper - President, Universal Wall Systems

LG_Chem_Holland_MI_02_KSO_US

Custom Creation

The LG Chem project used a very innovative application method for the highly insulating metal wall system. The designs required a custom 40” module horizontal Optimo Smooth wall panel with a narrow ¹⁄₄” reveal. Light gray and slightly darker gray Kingspan Optimo panels, each one two inches thick, surround the structure. These perfectly uniform insulated metal panels clad most of the exterior and also do double duty as an interior wall in the warehouse area of the building. In addition to the customized wall panel design, louvers and glazing were integrated into the wall panels to maintain that same ¹⁄₄” reveal pattern throughout the design.

LG_Chem_Holland_MI_05_KSO_US

Beautiful Performance

Because Kingspan insulated metal panels are a single-component system, installation time was reduced by as much as 50 percent over standard multipart site-assembled built-up cladding. Optimo provides a certain “Wow!” factor as it gives the LG Chem plant quite a visually pleasing exterior. This outer surface reflects the precision work performed in the scientific clean rooms where the advanced batteries are produced.

Products used on this project

LG_Chem_Holland_MI_Case_Study_COVER_OP_US

Download this case study

Case study PDF of LG Chem Production Plant in Holland, Michigan USA

Your local regional sales manager is ready to discuss your next project.