The Project

Perth Stadium Train Station was constructed in 2017 as part of the larger project for the precinct that included Optus Stadium. The station is the second biggest on the Transperth network and has the capacity to move 28,000 people per hour after an event.

The stations 6 platforms and concourse is sheltered by a broad roof structure, elegantly designed by Hassell using Kingspan's KingZip Building Envelope. Kingspan were engaged by Hassell during early concept design phase as the KingZip system was the only product on the market capable of achieving the design geometry, aesthetic vision and life expectancy setout for the project.
 

Architect:
Hassell Studio
Builder:
Lang O'Rourke/AECOM
Product:
KingZip Linea
Photographer:
Peter Bennetts
Completed:
2017
With the station being in a corrosive environment near the Swan River, the KingZip system was manufactured in 1.2mm Aluminium and a high build PVDF3 paint system to meet the life expectancy requirements of Perth Transport Authority. Utilising Kingspan’s mobile rollforming capabilities, the KingZip system was manufactured and curved on site down a minimum radius of 2m.
 
In addition the project utilised perforated KingZip sheets on either side of the concourse sections to assist with natural ventilation and air flow for passengers travelling through. KingZip offers the benefits of flexibility in design, advanced structural, thermal, acoustic and fire performance, as well as exceptional long term weatherisation and durability, and cyclone and Impact tested for Wind Regions C & D.