Colourfast in the harsh marine environment of Darling Harbour, along with the integration of panels with a glass oculus were just some of the challenges in the design brief for this project. Kingspan’s technical team worked closely with the contractor to overcome these unique installation challenges. After some considerable hard work and perseverance, the panels were seamlessly integrated with the glass oculus and some complex geometry was created. Whilst the project spans a large distance, there are no unsightly joints and an external and internal face was provided. Furthermore, whilst a slim design was chosen which maximised useable internal space, Kingspan’s technical team ensured there was no loss of thermal resistance values.